Latest verified update: 5 September 2026.

Taiwan's Ministry of Economic Affairs said on 2 September that Taiwanese companies had initiated an additional US$20 billion of investment in the United States. The announcement does not identify the companies, projects or states, so this amount is not allocated to any project row and is not added to the site-level total below.

TSMC's own current Arizona material now describes a planned $265 billion investment programme covering six logic fabs, two advanced-packaging facilities and an R&D centre. That newer company-level programme supersedes the older $65 billion, three-fab snapshot shown in the original tracker row below. The first fab is operating, the second fab structure is complete, and additional facilities remain at different construction and planning stages.

September 2026 verified additions and revisions
DevelopmentGeographyVerified scaleTracker treatmentPrimary source
Taiwanese industry additional US investment waveUnited States, sites not disclosedUS$20bnUnallocated reference only. Not distributed across states or existing company programmes.Taiwan MOEA
TSMC Arizona advanced-manufacturing programmeArizona$265bn planned investment; six logic fabs, two advanced-packaging facilities and an R&D centreSupersedes the earlier $65bn three-fab programme snapshot. Facility stages remain separate.TSMC Arizona

This update is displayed separately so the historical project table is not silently rewritten. ACR will fold the revised TSMC programme into the next full dataset rebuild while preserving the original federal-award context.

Scope rule: this tracker currently covers semiconductor fabs, advanced packaging and strategic manufacturing supply-chain projects. Large data-center projects are covered as an adjacent investment theme but are not added to the semiconductor total. See ACR's analysis of West Virginia's $81 billion data-center investment wave.

For definitions, source hierarchy, update policy and correction standards, read the publication's full research methodology.

American Commerce Review · Original data

US Industrial Investment Tracker: 25 Semiconductor and Strategic Manufacturing Projects

A state-level tracker of major US semiconductor fabs, packaging plants and supply-chain investments, with programme values, federal awards and project status kept separate.

Last reviewed: 2 September 2026. The dataset records disclosed values, definitions and status rather than estimating missing information.

The US semiconductor investment cycle spans leading-edge fabs, memory, advanced packaging, photonics and the less visible equipment and materials required to run a domestic supply chain. This tracker keeps private investment programmes and federal incentive awards in separate terms rather than adding them together.

A federal award does not mean the full private programme has already been spent. Project stage is therefore maintained independently from the announced capital figure.

US Industrial Investment Tracker: 25 Semiconductor and Strategic Manufacturing Projects
Company / projectStateDisclosed investment or awardStage at review datePrimary source
Micron Clay megafabNew YorkApprox. $100bn long-term New York vision; part of $6.165bn final CHIPS award covering NY and IdahoConstruction began in 2026; first concrete poured July 2026Source
Micron Boise leading-edge memory expansionIdahoApprox. $25bn long-term Idaho investment vision; part of $6.165bn final CHIPS award covering NY and IdahoFinal CHIPS award in place; multi-year manufacturing expansionSource
Micron Manassas legacy DRAM expansionVirginiaProject supported through a separate preliminary CHIPS memorandum in the 2024 Micron packagePreliminary federal terms announced; not counted as a final award in this trackerSource
Samsung Taylor leading-edge logic fabs and R&DTexasMore than $37bn broader Central Texas investment programme; up to $4.745bn final CHIPS awardFinal CHIPS award; Taylor campus development programmeSource
TSMC Phoenix three-fab programmeArizonaMore than $65bn three-fab plan in final CHIPS award; later company plans may be largerFirst fab operating; additional fabs in developmentSource
Intel Ohio leading-edge fabsOhioPart of Intel's nearly $90bn CHIPS-supported US investment through decade endFinal CHIPS award; multi-year fab construction programmeSource
Intel Arizona expansionArizonaPart of Intel's nearly $90bn CHIPS-supported US investment through decade endFinal CHIPS award; expansion programmeSource
Intel New Mexico advanced packagingNew MexicoPart of Intel's nearly $90bn CHIPS-supported US investment through decade endFinal CHIPS award; packaging expansion programmeSource
Intel Oregon R&D and manufacturingOregonPart of Intel's nearly $90bn CHIPS-supported US investment through decade endFinal CHIPS award; R&D and manufacturing investment programmeSource
GlobalFoundries Malta expansionNew YorkApprox. $13bn combined US investment over 10+ years; up to $1.5bn final CHIPS awardFinal CHIPS award; new and expanded capacity programmeSource
GlobalFoundries Burlington modernisationVermontIncluded in approx. $13bn US programme and final CHIPS awardFinal CHIPS award; modernisation and capacity investmentSource
Texas Instruments Sherman fabsTexasPart of more than $18bn for three new fabs through decade end; up to $1.61bn final CHIPS awardFinal CHIPS award; fab construction programmeSource
Texas Instruments Lehi fabUtahPart of more than $18bn for three new fabs through decade end; up to $1.61bn final CHIPS awardFinal CHIPS award; fab investment programmeSource
Amkor advanced packaging and test facility, PeoriaArizonaApprox. $2bn private investment; up to $407m final CHIPS awardFinal CHIPS award; greenfield packaging projectSource
SK hynix HBM packaging and R&D, West LafayetteIndianaApprox. $3.87bn investment; up to $458m final CHIPS awardGroundbreaking held August 2026; production targeted later in decadeSource
Microchip Colorado Springs fab expansionColoradoApprox. $90m proposed CHIPS support within $162m two-site preliminary packagePreliminary CHIPS terms; modernisation and expansion projectSource
Microchip Gresham fab expansionOregonApprox. $72m proposed CHIPS support within $162m two-site preliminary packagePreliminary CHIPS terms; expansion projectSource
BAE Systems Microelectronics Center, NashuaNew HampshireUp to $35.5m final CHIPS awardFinal award; modernisation intended to quadruple MMIC production capacitySource
Rocket Lab / SolAero compound semiconductor expansion, AlbuquerqueNew MexicoUp to $23.9m final CHIPS awardFinal award; modernisation and expansion intended to raise production by 50%Source
Corning semiconductor-grade glass expansion, CantonNew YorkUp to $32m final CHIPS awardFinal award; production expansion and process scale-upSource
Edwards Vacuum dry-pump plant, Genesee CountyNew YorkUp to $18m final CHIPS awardFinal award; greenfield semiconductor equipment manufacturing facilitySource
Infinera photonic semiconductor fab, San JoseCaliforniaPart of up to $93m final CHIPS award across California and PennsylvaniaFinal award; new fab intended to expand domestic InP PIC capacitySource
Infinera advanced test and packaging, BethlehemPennsylvaniaPart of up to $93m final CHIPS award across California and PennsylvaniaFinal award; new packaging and test facilitySource
Entegris semiconductor materials centre, Colorado SpringsColoradoUp to $77m final CHIPS awardFinal award; state-of-the-art materials manufacturing centreSource
Absolics glass-core substrate facility, CovingtonGeorgiaUp to $75m final CHIPS award; 120,000 sq ft facility referenced by CommerceFinal award; construction and technology scale-up programmeSource

Methodology

Rows represent identifiable US facilities or site-level programmes with company or Department of Commerce sourcing. Where one federal award covers several states, the award is described as part of a multi-site package rather than duplicated as if each site received the full amount.

Final awards, preliminary memoranda, construction milestones and operating production are different states. The tracker uses conservative language when a current site-level construction milestone has not been separately refreshed.